Featured CASE STUDIES

Case Study

CONCRETE LEG AND UNDERDECK CLEARANCE AND PREPARATION

Learn More

Case Study

CONCRETE LEG AND UNDERDECK CLEARANCE AND PREPARATION

The Dunlin Alpha platform was installed in 1977, comprising a concrete gravity base structure (CGBS), supporting a steel topsides deck, and production facilities.

Read the case study

Case Study

Seawater Disposal Caisson

Learn More

Case Study

Seawater Disposal Caisson

Upon accessing the SWD caisson and conducting a visual inspection, AquaTerra's team discovered that the damage to the caisson had escalated beyond initial expectations.

Read the case study

Case Study

Stena IceMAX

Learn More

Case Study

Stena IceMAX

The Stena IceMax is a 6th generation DP3 Drillship. One of four similar vessels owned and operated by Stena Drilling. The vessel required a Special Periodic Survey (SPS) in accordance with DNV standards.

Read the case study

Case Study

Hook-Up & Commissioning of an HDVC substation

Learn More

Case Study

Hook-Up & Commissioning of an HDVC substation

BorWin3 grid connection is a 900MW high-voltage direct current (HVDC) offshore interconnection substation located in the North Sea, approximately 130km off the coast of Borkum, Germany.

Read the case study

Case Study

BRAEFOOT BAY: AQUACLAM®

Learn More

Case Study

BRAEFOOT BAY: AQUACLAM®

The jetty structure is a live plant with constant vessel movements and loading activities this resulted in very limited access to the piles.

Read the case study

Case Study

DUNLIN CONDUCTOR REMOVAL: QUIKDECK®

Learn More

Case Study

DUNLIN CONDUCTOR REMOVAL: QUIKDECK®

The Dunlin Alpha platform was installed in 1977, comprising a concrete gravity base structure (CGBS), supporting a steel topsides deck and production facilities.

Read the case study

Case Study

ABS SPECIAL PERIODIC SURVEY

Learn More

Case Study

ABS SPECIAL PERIODIC SURVEY

The Valaris 92 is a jack up drilling rig owned by Valaris that currently operates in the North Sea.

Read the case study

Case Study

Heat Shield Installation

Learn More

Case Study

Heat Shield Installation

The scope of work was carried out during a shipyard repair and maintenance project and therefore numerous challenges were encountered.

Read the case study

Get in touch

Contact our expert team to discuss your requirements – we will be happy to help.