13 Apr Construction Inside the Concrete Utility Shaft on Brent Delta Posted at 14:36h in Case Study, Construction by Elaine Mackay Construction Inside the Concrete Utility Shaft on Brent Delta Project Overview AquaTerra’s multi-disciplined team safely delivered column intervention, restart and late life modifications including refurbishment and commissioning works. Download Full Case Study Back