Client:

Project overview:

Risk based inspection programme

  • 1500 Repairs identified and prioritised according to severity and risk assessment
  • Specialist access techniques produced significant cost, time and safety benefits compared to traditional scaffolding.

Access systems utilised;

  • Rope Access
  • Lightweight Cradles
  • Tension Netting
  • Mobile Hop Up

Work elements included:

  • Cleaning
  • Surface Preparation
  • Coating Application

Ability to re-locate to alternative locations at short notice to accommodate operational constraints without productivity losses

Provision of a safer, more flexible and competitive service.