Client:

Project overview:

Installation of fabricated heatshield panels on the Rowan Viking Jack-up rig

The project included:

  • the development of work pack and Job Card
  • taking responsibility for┬áMethod Statement and Risk Assessment preparation
  • Installation of a number of panels to the Drill Derrick and Crane
  • Provision of an Experienced Qualified Multi disciplined team;
    • Riggers
    • Steel Erectors
    • Fabricators
    • Platers
  • Provision of Rigging Loft, Access System, tools and equipment to manage and execute the work
  • Operatives worked under full BA system, 15,000 man hours