Client:

total logo

Project overview:

Removal of a 30 tonne conductor from under deck.

Scope of work:

  • Workpack and Job Card development
  • Method Statement, Lift Plans and Risk Assessment preparation
  • Selection and preparation of rigging and lifting equipment
  • Deck penetrations and lifting beams installation
  • Drilling and diamond wire cutting
  • Cross hauling of caisson to laydown area
  • Securing and cutting into sections
  • Removal to topside
  • Clamshell cutting on deck to manageable sizes